Kelf operative cutting in on carriageway night works

Civil engineering. Groundworks. Kelf.

Beyond thefoundations.

From the ground beneath our feet to the places we move through. Civil engineering and groundworks built on experience.

On site / M3 HookDrainage improvement works.
A family business. A hands-on approach.Discover Kelf ↓
HighwaysCommercialResidentialRail

Big on experience.
Personal in approach.

We're Kelf Civil Engineering. A family-run contractor with our head office in South Croydon and yards in Caterham and Detling, with more than 60 years of combined experience. Our work brings together groundworks, structures, drainage, surfacing and the external spaces that complete a project.

Leadership. KELF is led by Peter Suggett, Founder and Managing Director, and a director of KELF Civil Engineering Ltd (Companies House no. 13624290).

Meet the people behind the work ↗
60+

Years of combined experience across the team

£1.4m

Largest package to date — M3 Hook drainage scheme

11

Live projects currently on site

1,876,786

Hours worked without an accident

£35,712

Raised for charity in 2026–27

512

Community hours donated

From first dig.
To final finish.

The works below ground. The structures above it. The finishes that bring it together.

Deep drainage installation at Castle Irwell
Castle IrwellDeep drainage / Manchester
01

Civil engineering

Reinforced concrete, retaining walls, drainage and service infrastructure. Bringing the structural and below-ground elements of a scheme together.

Explore project examples ↗
02

Groundworks

Excavation, foundations, reinforced concrete slabs and drainage for commercial and residential developments.

View commercial work ↗
03

Surfacing

Roads, footpaths, cycleways and external areas. Project experience includes bridge surfacing, hospital footpath upgrades and residential resurfacing.

View highways work ↗
04

Basement construction

Discuss your basement scheme with the team, including the excavation, structural works and site access requirements.

Discuss a basement project ↗
05

Hard & soft landscaping

Paths, resin-bound finishes, fencing, retaining walls and external landscaping. The final elements that connect a building to its surroundings.

View residential work ↗

Clients and principal contractors we work with

Taylor WoodrowNational HighwaysNetwork RailStonebondPersimmon HomesVolkerHighwaysVolkerFitzpatrickTide ConstructionNU LivingBase BuildNHSFaithdean PLCCBREDomisGrangewood BuildersSB ConstructionWright Landscapes
Aerial view of excavator loading a dump truckMuck-away in motion

The work
speaks for itself.

From housing infrastructure and retail developments to motorway, bridge and rail works. Explore the scope, scale and detail of our projects.

32 projects

M3 Hook drainage — excavator and tipper on the drainage trench beside the motorwayHighways

M3, Hook — for Taylor Woodrow / National Highways

M3 Hook drainage

Filter drain reconstruction on the M3 — full-depth reconstruction averaging 2.2m deep, catchpit installation, filter stone and reinstatement, delivered through night-time closures on the live motorway.

Package value
£1.4m
Duration
6 weeks
Started
Mar 2026
A27 Stanmer drainage — night works with excavator, tipper and drainage pipeHighways

A27, Stanmer, near Brighton — for Taylor Woodrow / National Highways

A27 Stanmer drainage

Replacement of 450m of 375mm perforated, semi-perforated and half-perforated drainage pipe with filter stone replacement and manhole replacement, delivered on a 24-hour working pattern beside the live A27.

Package value
£900k
Duration
3 weeks
Started
May 2025
A3 Guildford footpath diversion works — Kelf excavator on siteHighways

A3, Guildford — for Taylor Woodrow / National Highways

A3 Guildford footpath diversions

Footpath diversionary works across the Surrey County Council network as part of the National Highways A3 Guildford scheme — new tarmac footways, flush edgings, timber-edged paths and verge reinstatement, completed September 2026.

Package value
£1.2m
Duration
15 weeks
Completed
Sep 2026
Northwood, Herne Bay — new estate road between homes under constructionResidential

Herne Bay, Kent — for Stonebond Properties

Northwood, Herne Bay

Residential infrastructure: adoptable and private drainage with more than 100 manholes, two attenuation tanks with over 960m³ of storage, foundations to DPC, roads, permeable paving, kerbs and surfacing.

Package value
c. £8.0m
Started
Jun 2024
Status
In progress
Chapel Green, Herstmonceux — drone view of the new estate roads and plotsResidential

Herstmonceux, East Sussex — for Persimmon Homes

Chapel Green, Herstmonceux

Infrastructure for 70 new homes: foul and storm drainage, SuDS and attenuation basins, foundations, estate roads, retaining walls and utilities.

Package value
£7.0m
Homes
70
Started
Mar 2026
Otterham Quay Lane, Rainham — new asphalt estate road with kerbsResidential

Rainham, Kent — for Stonebond Properties

Otterham Quay Lane, Rainham

Adopted roads and sewers to Kent County Council standards, a pumping station more than 4m deep, S278 site entrance, swales and pond, earthworks and piling platforms.

Package value
c. £4.5m
Programme
70 weeks
Started
Jun 2026
Earlsfield, London — excavator on the remediation siteResidential

Earlsfield, London

Earlsfield remediation

Ground remediation to prepare the site for new flats, including removal of about 1,000 tonnes of radioactive waste, next to the River Wandle with a high water table.

Package value
£2m
Duration
6 months
Agricultural barn, St Albans — steel frame on new concrete slabCommercial

St Albans, Hertfordshire

Agricultural barn, St Albans

New agricultural barn: external drainage, groundworks, reinforced concrete, piling, brickwork, paving and soft landscaping.

Package value
£1.2m
Duration
8 months
Marks & Spencer — Purley Way, CroydonCommercial

Purley Way, Croydon

M&S Purley Way

Drainage, service trenches, a new substation, surfacing and landscaping for delivery and freezer enabling works.

Package value
£650k
Duration
5 months
Started
Jul 2023
Cluny Mews, Earls Court — finished resin-bound communal gardenResidential

Earls Court, London

Cluny Mews

External communal areas for a high-end housing development: deep drainage, sewer connections, hard and soft landscaping, resin-bound surfacing and balcony pedestal paving.

Package value
£500k
Duration
3 months
Tim Hortons — North LondonCommercial

North London

Tim Hortons

Foundations, reinforced concrete slabs, drainage, demolition and landscaping for a new drive-through.

Package value
£450k
Duration
3 months
Started
Apr 2022
M&S Guildford — operatives finishing a new concrete slabCommercial

Guildford, Surrey

M&S Guildford

Retail unit conversion: internal and external drainage, reinforced concrete, surfacing, road markings, paving, street furniture, demolition and utilities.

Package value
£400k
Duration
3 months
Basildon, Essex — operative laying block pavingResidential

Basildon, Essex

Basildon communal areas

Upgrade of external communal areas on an existing housing development: drainage, hard and soft landscaping, street furniture, road markings, ground remediation and utilities.

Package value
£300k
Duration
4 months
KELF rail team working on an operational station platformRail

Bexley, London

Bexley rail works

Rail civil works at Bexley, including subway works planned around possessions, with careful access, sequencing and interface management.

Package value
£260k
Woodcote Grove, Epsom — finished car park with new surfacing and markingsResidential

Epsom, Surrey

Woodcote Grove

Resurfacing, road markings, fencing, drainage, resin-bound finishes and reinforced concrete retaining walls.

Package value
£250k
Duration
2 months
Started
Oct 2022
Stoke Bridge, Isle of Grain — new surfacing and kerbs across the bridge deckHighways

Isle of Grain, Kent

Stoke Bridge

Bridge re-waterproofing, new kerbs and surfacing at the Isle of Grain.

Package value
£200k
Duration
2 months
Started
Jul 2023
KELF rail civil works beside the operational railwayRail

Brighton Road

Brighton Road rail works

Rail civil-engineering package in a live operational setting, including collision protection beam anchors, grouting and concrete infill.

Package value
£180k
Sainsbury’s Blackheath — new brick retaining wall under scaffoldCommercial

Tranquil Vale, Blackheath, London

Sainsbury’s Blackheath

Restricted-access basement works: drainage, core drilling, structural masonry, temporary works and a brick retaining wall.

Structural posts
9
400mm cores
4
Retaining wall
40m²
Epsom Hospital — KELF operatives working inside the site compoundCommercial

Epsom, Surrey

Epsom Hospital

Surfacing and footpath upgrades across the hospital estate.

Package value
£150k
Duration
2 weeks
Started
Mar 2023
Castle Irwell, Manchester — deep drainage trench with trench support and excavatorResidential

Manchester

Castle Irwell

Five-metre-deep drainage for a new residential development for Domis.

Package value
£150k
Duration
1 month
Started
Jun 2023
Sainsbury’s Lewes Road, Brighton — car park entranceCommercial

Lewes Road, Brighton — for Sainsbury’s

Sainsbury’s Lewes Road car park

Reinforced concrete repairs to a live car park: soffit, slab and column repairs across 21 structural zones, rebar treatment and replacement, and resin crack injection to BS EN 1504.

Package value
£150k
Sainsbury's — WilsdenCommercial

Wilsden

Sainsbury's Wilsden

Demolition and replacement of a retaining wall at the delivery exit, with brickwork and road markings.

Package value
£150k
Duration
2 months
Started
Jul 2023
Four Elms, Chattenden — new footpath and cycleway beside the roadHighways

Chattenden, Kent

Four Elms

A new footpath and cycleway in Chattenden.

Package value
£100k
Duration
1 month
Started
Aug 2023
Co-op Brighton — operatives forming a new slab for the extensionCommercial

Brighton

Co-op Brighton

Extension of an existing retail unit on a highly restricted site: internal drainage, internal modifications, reinforced concrete and brickwork.

Package value
£100k
Duration
2 months
Kingswood, Surrey — resin-bound paths being laidResidential

Surrey

Kingswood

Asphalt and resin-bound paths to the front and rear gardens of two residential homes.

Package value
£70k
Duration
2 weeks
Started
Jul 2023
Sainsbury’s Local, Gospel Oak — completed store frontCommercial

Gospel Oak, London

Sainsbury’s Gospel Oak

Conversion of a retail space: groundworks, reinforced concrete, brickwork, hard landscaping, internal drainage, demolition and utilities.

Package value
£70k
Duration
1 month
Nursery playground, Woking — new safety surfacing and play areaCommercial

Woking, Surrey

Nursery playground, Woking

New play area for a nursery: hard and soft landscaping, playground installation, surfacing, markings, external drainage and utilities.

Package value
£70k
Duration
2 months
Horsted Way, Medway — new crossing island with tactile pavingHighways

Medway, Kent

Horsted Way

Footway improvements and new pedestrian crossing points: hard landscaping, kerbs, ducting and asphalt surfacing.

Package value
£60k
Duration
3 weeks
Birch Grove, Medway — resurfaced residential footpathHighways

Medway, Kent

Birch Grove

Upgrade of footpaths along a residential road with a school, phased outside term time: kerbs and asphalt surfacing.

Package value
£60k
Duration
3 weeks
Co-Op — AshingtonCommercial

Ashington

Co-op Ashington

Deep drainage, reduced-level excavation, foundations, reinforced concrete slab, brickwork and demolition.

Package value
£50k
Duration
1 month
Started
Sep 2023
Co-op Reading — car park works behind barriers outside the storeCommercial

Reading, Berkshire

Co-op Reading

Car park resurfacing and new road markings, phased to keep pedestrian access open.

Package value
£20k
Duration
1 week
Polhill Drive, Medway — operatives laying a new footpath surfaceHighways

Medway, Kent

Polhill Drive

Footpath resurfacing completed in one week, with safe pedestrian routes kept open.

Package value
£15k
Duration
1 week

Selected works, completed and in progress. Values and dates relate to the individual KELF packages; c. = approximate.

The people
behind Kelf.

Meet the team across leadership, procurement, operations, commercial management and site delivery.

Peter Suggett

Peter Suggett

Founder & Director

Ryan Suggett

Ryan Suggett

Procurement Manager

James Craddock

James Craddock

Operations Manager

Ben Suggett

Ben Suggett

Works Manager

Gee Kallu

Gee Kallu

Contracts Manager

Susan Mutyaba

Susan Mutyaba

Quantity Surveyor

Ositadima Emezi

Ositadima Emezi

Trainee Quantity Surveyor

Lito Atiera

Site Engineer

Chris Halvorsen

Chris Halvorsen

Supervisor

Build your next chapter with us.

Skilled, hard-working and ready for your next opportunity? Send the team a covering note and your CV.

Join the team

Standards
behind the work.

Quality, health and safety, and environmental management.

Constructionline Gold
CHAS
RISQS
Acclaim Accreditation
Alcumus
ISO 9001
ISO 14001
ISO 45001

Constructionline Gold · CHAS · RISQS (supplier no. 9791) · Acclaim · Alcumus · ISO 9001 · ISO 14001 · ISO 45001

For current certificates and supply-chain information, contact our team.

Request information ↗

Projects past and present
and where to find us.

Our head office in South Croydon, our yards in Caterham and Detling, and the schemes we've delivered across the South East and beyond. Tap a pin for the project. Locations shown at town level.

Zoom and drag to explore. Head office Yards Projects past and present

Good projects start
with a conversation.

  1. 01

    Share the schemeLocation, scope and anticipated programme.

  2. 02

    Talk it throughWe review the package and come back to discuss it.

  3. 03

    Agree and mobiliseScope, programme and price agreed before we start.

Have a scheme in mind or a package to discuss? Tell us what you're planning.

Kelf Civil Engineering Ltd
Head office: 37 Brighton Road
South Croydon CR2 6EB
Yards: Paddock Barn Farm, Godstone Road, Caterham CR3 6SF, and Detling, Kent

Opens a draft in your email app for you to review and send.